• sns03
  • sns01
  • sns02
  • youtube(1)
69586bd9

Short Lead Time for Brass Gas Burner Parts - Cardan shaft – Daohong

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Sticking to your belief of "Creating solutions of high quality and generating buddies with people from all around the world", we always put the fascination of customers to start with for Medical Machining Medical Cnc Machining , Oem Cnc Machining , Aluminum Machining Speeds Cnc , Our company is working by the operation principle of "integrity-based, cooperation created, people oriented, win-win cooperation". We hope we can have a friendly relationship with businessman from all over the world.
Short Lead Time for Brass Gas Burner Parts - Cardan shaft – Daohong Detail:

Professional Information

oduct Name

Precision Double Cardan Joint Shaft Universal Couplings

Application

Vehicle, ATV, some steering and transmission systems, industrial equipment, wood-working equipment, printing machines etc.

Maximum Speed

4000 R/M(needle roller); 1000 R/M(pin and block)

Surface Treatment

Additional corrosion protection can be offered by different forms of surface treatments. Standard options in clude black oxide, Zinc and Nickel treatment.

MOQ

Different item has different MOQ

Tolerance

+/-0.02mm

Features

* Many sizes available
* Available in various materials
* Customer’s drawing or sample is welcomed.
* Help design the good to match customer’s product and some subtle suggestions will optimize the performance and reduce the cost
* All the subcomponents are precisely assembled, resulting in better overall and consistent performance

Good Quality Product & Superior Service

OEMs often have needs for new and redesigned products for universal joints that can not be satisfied with off-the-shelf u joint designs. Be it an uncommon shaft design, unusually high speeds or torque, or otherwise harsh operating conditions, we can design and manufacture a custom u joint along with the special hub machining needed to fit your application.

Packing:

Carton Size

29*20*13 CM or customer’s request

Pallet size

120*80*80 CM or customer’s request

Lead time

3-7 working days as usual.It will based on the detailed order quantity.

Packing Details

Method 1: Shrink film, then bulk loading

Method 2: Shrink film + box + pallet/ wooden case

Method 3: PP + wooden case

Method 4: As per customers’ requirements or negotiated


Product detail pictures:

Short Lead Time for Brass Gas Burner Parts - Cardan shaft – Daohong detail pictures

Short Lead Time for Brass Gas Burner Parts - Cardan shaft – Daohong detail pictures

Short Lead Time for Brass Gas Burner Parts - Cardan shaft – Daohong detail pictures

Short Lead Time for Brass Gas Burner Parts - Cardan shaft – Daohong detail pictures

Short Lead Time for Brass Gas Burner Parts - Cardan shaft – Daohong detail pictures


Related Product Guide:

Our firm aims to operating faithfully, serving to all of our consumers , and working in new technology and new machine continually for Short Lead Time for Brass Gas Burner Parts - Cardan shaft – Daohong, The product will supply to all over the world, such as: Japan, Moldova, Palestine, Our company is continuing to serve customers with high quality, competitive price and timely delivery. We sincerely welcome friends from all over the world to cooperate with us and enlarge our business. If you are interested in our products, please feel free to contact us. We would love to provide you with further information.
  • After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
    5 Stars By Joa from Poland - 2017.10.23 10:29
    We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
    5 Stars By Kimberley from Ghana - 2017.08.21 14:13