2020 New Style Upc Plumbing Parts - Assembly Drawing Cnc Machine Parts Products – Daohong Detail:
Name | Brass parts |
Main product | CNC milling products, CNC turning products, grinding products,wire EDM cutting products, drilling products, welding products,precision casting products, forging products, etc. |
Material | Aluminum Alloy:5052 /6061/ 6063 / 2017 / 7075 / etc. |
Brass Alloy:3602 / 2604 / H59 / H62 / etc. | |
Stainless Steel Alloy:303 / 304 / 316 / 412 / etc. | |
Steel Alloy:Carbon Steel / Die Steel / etc. | |
Other Special Materials:Lucite / Nylon / Bakelite / etc. | |
Production equipment | 1) CNC PRECISION AUTOMATIC LATHE |
2)Grinding machine | |
3) Tsugami Machines | |
4)Flatter machine | |
5)hobbing gear machine | |
6)CNC maching | |
Surface treatment | Polishing, Sandblasting, Painting, Powder coating ,Galvanizing,Chrome plating |
Accuracy | Accuracy Of Machining:+/-0.001mm |
Accuracy Of Grinding:+/-0.001mm | |
Surface Roughness:Ra0.6 | |
Parallelism:+/-0.001mm | |
Verticality:+/-0.001mm | |
Concentricity:0.001mm | |
Quality control anddetection equipment | Our QC department work is inspection and final inspection.We promise you as below: |
1. Check the raw material before the production. | |
2. Have inspection during the production. | |
3. Make 100% inspection before the shipment. | |
Measuring & testing equipments | Profile Projector, Rockwell Hardness Tester, Vickers Hardness Tester,Roughness Tester,Salt Spray Test Machine, Micrometers, height gaugeetc. |
Packing:
Carton Size | 29*20*13 CM or customer’s request |
Pallet size | 120*80*80 CM or customer’s request |
Lead time | 3-7 working days as usual.It will based on the detailed order quantity. |
Packing Details |
Method 1: Shrink film, then bulk loading |
Method 2: Shrink film + box + pallet/ wooden case | |
Method 3: PP + wooden case | |
Method 4: As per customers’ requirements or negotiated |
Picture
Product detail pictures:






Related Product Guide:
It really is our obligation to satisfy your requirements and efficiently serve you. Your fulfillment is our greatest reward. We're hunting forward to your check out for joint development for 2020 New Style Upc Plumbing Parts - Assembly Drawing Cnc Machine Parts Products – Daohong, The product will supply to all over the world, such as: Bangkok, Turkey, Buenos Aires, With the goal of "zero defect". To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.

After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
